Drilling module
Client: BP Exploration
Weight: 1700 tonnes
Contract awarded: 2002
Year of delivery: 2004
Scope of Work:
Detail design, procurement of bulk materials, incl. piping, valves, and special items. Fabrication of module sections. Assembly of the Shah Deniz drilling module and commissioning including drilling. Disassembly for transport. Load-out and transport (3 barges) through the Russian river system. Reassembly in Baku.